$50,000+ Business Grants Open Now — 2026
82 US business grant programs advertising a maximum award of $50,000 or more are open as of November 19, 2026 — 40 state, 30 federal, 6 city or county, and 6 private or foundation. The tier’s real price is not the odds. A $50,000-plus application in the GrantCompass catalog takes a median of 25 hours to prepare; in our August 24, 2026 extract the figure for open grants under $25,000 was 4 hours, while mean competitiveness barely moved (3.28 versus 2.90 on a 1–5 scale). 37 of the 82 pay by match or reimbursement, so the business funds the work before the grant funds the business. Since the October 1 recompute, 8 programs have left the open list and 30 have joined it, including the Department of Defense’s FY27 Release 1 SBIR topics, which close November 25, 2026. No row still says Check status.
Updated November 19, 2026 — open status, dates and amounts recomputed against the GrantCompass catalog on November 19, 2026. Amounts and statuses featured in prose were re-read at the administering agency’s own page on August 24, 2026 unless marked otherwise; table rows and the dated cards carry the catalog’s stored values. We recompute this page every month, at this same address.
See every program you qualify for — free →A two-minute eligibility check ranks all 660+ US programs against your business. No card, no pitch deck.
Every $50,000+ grant that is open, with what it costs you
All 82 open programs, largest advertised ceiling first. Filter by intake type, state, industry and award floor. The fourth column is the one most lists omit: whether the money arrives as a direct payment, only against a matching contribution, or as a reimbursement of costs you have already paid. Rows whose note opens with a tick were re-read at the administering agency’s own page in late August 2026, and where the agency disagreed with our stored record the agency’s version is what you see.
Showing 82 of 82 programs of $50,000 or more
| Program | Advertised ceiling | Intake | How the money arrives | Level | Win Layer |
|---|---|---|---|---|---|
| ARPA-H Innovative Solution Openings (ISOs) — Health Technology OT Agreements Rolling — ARPA-H publishes ISOs continuously. Check arpa-h.gov/explore-funding/open-funding-opportunities for current op… | Varies — typically $1M–$50M | Rolling | Paid direct | Federal · All US | 7 locked |
| North Carolina Film and Entertainment Grant Rolling — apply to NC Film Office before production. Annual fund has a July 1–June 30 fiscal year window. | 25% of qualifying NC spend | Rolling | Reimbursed | State · NC | 6 locked |
| EDA Public Works & Economic Adjustment Assistance (PWEDA) Rolling applications accepted year-round. No fixed annual deadline — submit when project is ready. Applications reviewed… | $100K–$10,000,000+ | Rolling | Paid direct | Federal · All US | 6 locked |
| DOE Advanced Nuclear Energy Licensing Cost-Share Grant Program Rolling applications accepted through November 30, 2026, subject to available funding (DE-FOA-0003339) | Varies (cost-share structure) | Nov 30, 2026 11 days | Match / cost-share | Federal · All US | 6 locked |
| Wyoming Business Ready Community Grant & Loan Program ✓ Cities, towns, counties and joint-powers boards are the primary applicants; a business takes part as the committed employer (Wyoming Business Council, verified Aug 23 2026). | Up to $5,000,000 | Rolling | Paid direct | State · WY | 6 locked |
| DOE Office of Science — FY2026 Continuation of Solicitation for the Financial Assistance… The FY2026 solicitation (DE-FOA-0003600) closed September 30, 2026; its successor FY2027 solicitation (DE-FOA-0003665) i… | $50K–$5,000,000/year | Sep 30, 2027 | Match / cost-share | Federal · All US | 6 locked |
| One North Carolina Fund Rolling — no annual cycle. Applications submitted through NC Commerce Business Services Division as projects are in acti… | Varies — typically $100K–$5M | Rolling | Paid direct | State · NC | 7 locked |
| Tennessee FastTrack Economic Development Fund ✓ Negotiated through a local government during active site selection; there is no public application portal (TNECD, verified Aug 23 2026). | Negotiated; $250K–$5M typical | Rolling | Paid direct | State · TN | 6 locked |
| Minnesota Job Creation Fund ✓ Deal-by-deal through Minnesota DEED. DEED's published ceiling is up to $1,000,000, well below the stored range (checked Aug 23 2026). | Varies — typically $500K–$3M | Rolling | Paid direct | State · MN | 6 locked |
| LPS Qubit Collaboratory (LQC) Rolling — BAA open through April 30, 2027; proposals accepted on a continuous basis | Up to $800K/yr | Apr 30, 2027 | Match / cost-share | Federal · All US | 0 locked |
| SBIR Phase II — NIH (PHS Omnibus) Next standard NIH receipt date: January 5, 2027. | Up to $2.15M (Phase II) | Jan 5, 2027 47 days | Paid direct | Federal · All US | 7 locked |
| STTR Phase II — NIH (PHS Omnibus) Next standard NIH receipt date: January 5, 2027. | Up to $2.15M (STTR Phase II) | Jan 5, 2027 47 days | Paid direct | Federal · All US | 7 locked |
| SBIR Phase II — Department of Defense Component-dependent — DoD Phase II applications are submitted by invitation from the component that funded Phase I, typi… | Up to $2M (Phase II) | Rolling | Paid direct | Federal · All US | 7 locked |
| USDA MPPEP Phase 3 Round 2: Invasive Wild-Caught Catfish Processing December 7, 2026 at 11:59 PM Eastern Time | $50,000 to $2,000,000 | Dec 7, 2026 18 days | Match / cost-share | Federal · All US | 6 locked |
| EDA Economic Adjustment Assistance — Revolving Loan Fund (RLF) Program Rolling — EDA accepts RLF applications under its standing FY2025 Public Works and Economic Adjustment Assistance NOFO. U… | $800K–$1.4M (to RLF operator) | Rolling | Paid direct | Federal · All US | 6 locked |
| MassCEC Heat Pump and HVAC Training Network Strand A: deadline was March 18, 2026 (check for new rounds). Strand B: rolling enrollment through May 15, 2027. Check m… | Up to $1,200,000 (Strand B rolling) | May 15, 2027 | Paid direct | State · MA | 6 locked |
| SBIR Phase II — NSF (America's Seed Fund) Phase II is open only to NSF Phase I awardees, who may submit between 6 and 24 months after their Phase I start date; no… | Up to $1M (Phase II) | Mar 4, 2027 | Paid direct | Federal · All US | 7 locked |
| NYSERDA FlexTech — Flexible Technical Assistance Program (Energy Studies) ✓ NYSERDA's FlexTech page is script-rendered and could not be machine-read on August 24, 2026; the stored cost-share share and ceiling are unconfirmed at source. | 50-75% cost-share, up to $1M | Rolling | Match / cost-share | State · NY | 6 locked |
| CDC/NIOSH Commercial Fishing Occupational Safety Research Cooperative Agreement ✓ Next standard receipt date: January 26, 2027; the receipt date of August 28, 2026 passed. | $150K–$975K | Jan 26, 2027 | Match / cost-share | Federal · All US | 6 locked |
| U.S. Fish & Wildlife Service Partners for Fish and Wildlife Program Rolling — no published deadline; contact your state coordinator for a site visit | $1–$750,000 per project | Rolling | Match / cost-share | Federal · All US | 6 locked |
| Texas Skills Development Fund ✓ Year-round. The applicant of record is a Texas public community or technical college, TEEX or TEES — not the business (Texas Workforce Commission, checked Aug 24 2026). | Up to $500,000 | Rolling | Paid direct | State · TX | 6 locked |
| Ben Franklin Technology Partners — Seed Investment Program Rolling — Healthcare applications reviewed continuously. Technology applications on scheduled review cycles. Contact you… | $50,000–$500,000 | Rolling | Paid direct | State · PA | 6 locked |
| Idaho Workforce Development Council — Employer Training Grant Quarterly review; submit by 5pm MT on December 4, 2026 for the January Grant Review Committee | Up to $500,000 | Dec 4, 2026 15 days | Reimbursed | State · ID | 6 locked |
| Oregon Business Expansion Program (Business Oregon Expansion Fund) Rolling — Business Oregon accepts applications year-round, subject to available annual budget. Engage regional project m… | Negotiated; income-tax-based | Rolling | Paid direct | State · OR | 6 locked |
| U.S. Fish & Wildlife Service Coastal Program Rolling — no published deadline; start by contacting Coastal Program field staff | $1–$500,000 per project | Rolling | Paid direct | Federal · All US | 6 locked |
| EPA Brownfields Cleanup Grants Open now. FY27 Cleanup Grant applications are due January 21, 2027 (11:59 pm ET); EPA anticipates selections in June 202… | Up to $500,000 ($650K with waiver) | Jan 21, 2027 | Reimbursed | Federal · All US | 6 locked |
| RISE PA — Small Award Track (SAT) for Small Manufacturers Round 5 is open September 15 to December 15, 2026 | Up to $500,000 (50% cost-share) | Dec 15, 2026 26 days | Match / cost-share | State · PA | 6 locked |
| Texas Enterprise Fund Rolling — applications accepted year-round; no fixed cycle. Governor's office evaluates on a project-specific timeline. | Negotiated; $500K–$50M+ | Rolling | Paid direct | State · TX | 7 locked |
| USDA FAS Emerging Markets Program (EMP) Rolling tranches — the first FY2027 deadline (August 14, 2026) has passed, but applications are still accepted and consi… | Varies — $8M across ~40 awards | Dec 31, 2026 42 days | Match / cost-share | Federal · All US | 6 locked |
| USDA TASC — Technical Assistance for Specialty Crops Rolling tranches: the first FY2027 deadline (August 14, 2026) has passed, but applications are still accepted and consid… | Up to $500,000/year | Dec 31, 2026 42 days | Match / cost-share | Federal · All US | 6 locked |
| Maryland Stem Cell Research Fund (MSCRF) Commercialization Award Submission deadline is January 20, 2027 at 5:00 p.m. EST. Peer review the week of April 4, 2027; awards announced May 20… | Roughly $300K–$400K per award | Jan 20, 2027 | Paid direct | State · MD | 6 locked |
| City of Dallas Small Business Assistance Program (SBAP) Rolling — no fixed application window. Applications reviewed as submitted. Project must not have begun before applicatio… | Up to $400,000 | Rolling | Paid direct | Local · TX | 6 locked |
| NOAA National Bycatch Reduction Engineering Program (BREP) — FY 2026/27 Full proposals due January 22, 2027 | $50,000–$400,000 | Jan 22, 2027 | Paid direct | Federal · All US | 6 locked |
| New Jersey Innovation Fellows Program (Cohort III) December 4, 2026 at 5 PM EDT (Cohort III) | $200,000 base, up to $400,000 | Dec 4, 2026 15 days | Paid direct | State · NJ | 6 locked |
| SBIR Phase I — NIH (PHS Omnibus) Next standard NIH receipt date: January 5, 2027. | Up to $323,090 | Jan 5, 2027 47 days | Paid direct | Federal · All US | 7 locked |
| STTR Phase I — NIH (PHS Omnibus) Next standard NIH receipt date: January 5, 2027. | Up to $323,090 (STTR Phase I) | Jan 5, 2027 47 days | Paid direct | Federal · All US | 7 locked |
| SBIR Phase I — NSF (America's Seed Fund) Project Pitches are being accepted under the new solicitations (NSF 26-510); the next full-proposal deadline is March 4,… | Up to $305K (Phase I) | Mar 4, 2027 | Match / cost-share | Federal · All US | 1 locked |
| STTR Phase I — NSF NSF SBIR/STTR is accepting Project Pitches and full proposals; the next full-proposal deadline is March 4, 2027 (then Ju… | Up to $305,000 | Mar 4, 2027 | Paid direct | Federal · All US | 1 locked |
| Draper Richards Kaplan Foundation — Impact Funding Rolling — applications accepted year-round, no fixed deadline | Up to $300K over 3 yrs | Rolling | Paid direct | Foundation · All US | 7 locked |
| SBIR Phase I — U.S. Army Rolling topics — Army SBIR|STTR posts topics on armysbir.army.mil and DSIP, each with its own close date. Its G-TEAD USA… | Up to $300K (Phase I) | Rolling | Paid direct | Federal · All US | 7 locked |
| SBIR Phase I — U.S. Air Force / AFWERX The FY27 Release 1 Air Force topics (solicitations 27.BZ and 27.TZ, 16 topics) are open now and close November 25, 2026… | Up to $250K (Phase I) | Nov 25, 2026 6 days | Paid direct | Federal · All US | 7 locked |
| SBIR Phase I — DARPA DARPA SBIR topics (DoW 2026 BAA, DPA26BZ06): most closed October 21, 2026; topic DPA26BZ06-DV028 (TRIAGE-X) stays open u… | Up to $250K (Phase I) | Nov 25, 2026 6 days | Paid direct | Federal · All US | 7 locked |
| SBIR Phase I — Department of Defense DoW FY27 Release 1 is open now (opened October 28) and closes November 25, 2026 at 12:00pm ET; DoW now issues SBIR topic… | Up to $250K (Phase I) | Nov 25, 2026 6 days | Paid direct | Federal · All US | 1 locked |
| SBIR Phase I — Department of Energy Open now: DOE's Fall 2026 SBIR/STTR Phase I topics (more than $200 million; grid innovation, nuclear detonation detectio… | Up to $250K (Phase I, by topic) | Dec 16, 2026 27 days | Paid direct | Federal · All US | 7 locked |
| STTR Phase I — Department of Energy Open now for one topic: DOE ARPA-E's UNLOCK SBIR/STTR (subsurface resources, combined Phase I/II). Concept papers are du… | $200K–$250K (STTR Phase I) | Nov 20, 2026 Closed | Paid direct | Federal · All US | 7 locked |
| Thiel Fellowship Rolling; no deadline (applications accepted year round) | $250,000 over two years | Rolling | Paid direct | Foundation · All US | 6 locked |
| SBIR Phase I — U.S. Navy / ONR Navy topics in DoW FY27 Release 1 close November 25, 2026 at noon ET. | Up to $140K + $100K option (Phase I) | Nov 25, 2026 6 days | Paid direct | Federal · All US | 7 locked |
| Wyoming SBIR/STTR Match Grant ✓ Year-round; applicants are notified within about two weeks of the virtual pitch (Wyoming Business Council, checked Aug 24 2026). | Up to $100K (Ph I) / $200K (Ph II) | Rolling | Paid direct | State · WY | 6 locked |
| Minnesota Job Skills Partnership (MJSP) Rolling — DEED accepts applications year-round and reviews on a rolling basis. No fixed cycles. | Up to 50% of training costs | Rolling | Match / cost-share | State · MN | 6 locked |
| Minnesota Job Training Incentive Program (JTIP) Rolling — applications accepted year-round on a first-come, first-served basis until funds are exhausted. | $5,000–$9,000 per new job | Rolling | Reimbursed | State · MN | 6 locked |
| ReStore Boston — Storefront Improvement Grant Five deadlines annually: February 1, April 1, May 15, September 1, and November 1 | Up to $200,000 | Feb 1, 2027 | Match / cost-share | Local · MA | 6 locked |
| Missouri Value-Added Agriculture Grant Program (MASBDA) December 15, 2026, 3 p.m. (for March 2027 funding) | Up to $200,000 | Dec 15, 2026 26 days | Match / cost-share | State · MO | 6 locked |
| Chicago Small Business Improvement Fund (SBIF) Rolling — monthly application windows by TIF district; see rollout calendar at chicago.gov/sbif | Up to $150,000 | Rolling | Match / cost-shareReimbursed | Local · IL | 7 locked |
| Colorado Existing Industry Customized Training Program Rolling — applications accepted through OEDIT subject to annual appropriations. | Up to $1,500/employee; $150K max | Rolling | Reimbursed | State · CO | 6 locked |
| Connecticut Innovations Pre-Seed Investment Program Rolling — pitch decks accepted year-round. Initial response within one week. | Up to $150K pre-seed | Rolling | Paid direct | State · CT | 6 locked |
| Nebraska Innovation Fund Prototype Grant Rolling until funds are exhausted; the current application period closes June 30, 2027. | Up to $150,000 | Jun 30, 2027 | Match / cost-share | State · NE | 6 locked |
| Connecticut Manufacturing Innovation Fund Voucher Program (MVP) ✓ Rolling and first-come; the $100,000 ceiling is confirmed at CCAT (checked Aug 24 2026). The match ratio and the Connecticut-tenure rule are not on a machine-readable official page — confirm with CCAT first. | $6,250–$100,000 | Rolling | Match / cost-share | State · CT | 6 locked |
| Connecticut Innovations Proof-of-Concept Fund Rolling — pitch decks/business plans accepted year-round. Initial response within one week. Full due diligence 3.5–24 mo… | $50K–$100K convertible note | Rolling | Paid direct | State · CT | 6 locked |
| WorkInvestNH (New Hampshire Job Training Fund) Rolling — applications accepted year-round, but must be submitted at least 60 days before the planned training start dat… | $750–$100,000 (50% match) | Rolling | Match / cost-shareReimbursed | State · NH | 6 locked |
| WEDnetPA — Pennsylvania Workforce and Economic Development Network ✓ Per-worker cap $2,000; per-company annual cap is $50,000, not the $100,000 stored here. The FY2026-27 cycle opened August 1, 2026 (WEDnetPA, checked Aug 24 2026). | Up to $2,000/worker; $100K max | Rolling | Reimbursed | State · PA | 6 locked |
| Indiana FAST Program — SBIR/STTR Matching Grant Rolling — applications processed after federal SBIR/STTR Phase II award is received. | Up to $75,000 per Phase II award | Rolling | Paid direct | State · IN | 6 locked |
| Wyoming Workforce Development Training Fund — Business Training Grants Rolling — applications accepted year-round. Must be submitted 30–110 days before training begins. | Up to $4,000/trainee/year | Rolling | Reimbursed | State · WY | 6 locked |
| West Sacramento Small Business Assistance Program Rolling applications | $5,000–$75,000 (component-dependent) | Rolling | Paid direct | Local · CA | 6 locked |
| Hawaiʻi Small Business Innovation Research (HSBIR) Matching Grant FY27 Phase 0 and Phase I applications close December 11, 2026 (11:59pm). | Up to 50% match, up to $75,000 (Phase 0: $3K) | Dec 11, 2026 22 days | Match / cost-share | State · HI | 6 locked |
| One North Carolina Small Business Program (SBIR/STTR Incentive & Matching Funds) FY 2026-27 SBIR/STTR Incentive applications are open until June 30, 2027 or until funds are exhausted; the Matching soli… | Up to $12K (Incentive) / up to $75K (Matching) | Jun 30, 2027 | Reimbursed | State · NC | 6 locked |
| Elevate Vermont — SBIR/STTR Matching Grant ✓ Non-competitive and first-come, year-round, for companies that already hold a federal SBIR or STTR award. Five awards per business, lifetime (Vermont ACCD, checked Aug 24 2026). | Up to $50,000 | Rolling | Paid direct | State · VT | 6 locked |
| Maine Technology Institute (MTI) Business Innovation Seed Grant Rolling — no fixed deadline. Apply when your project is ready. MTI evaluates applications continuously. | $5,000–$50,000 | Rolling | Match / cost-share | State · ME | 6 locked |
| SCRA Technology Startup and Acceleration Grants Rolling — applications are invited by assigned SCRA investment manager after achieving SCRA Member Company status | $25K–$50K non-dilutive | Rolling | Match / cost-share | State · SC | 6 locked |
| Amber Grant for Women Rolling — monthly, last day of each calendar month | $15K/mo + $75K year-end | Rolling | Paid direct | Private · All US | 7 locked |
| Indiana Skills Enhancement Fund (SEF) Rolling — applications accepted throughout the year subject to biennium funding availability. | Up to $50,000/biennium | Rolling | Reimbursed | State · IN | 6 locked |
| Connecticut Manufacturing Innovation Fund — Incumbent Worker Training (IWT) Program Rolling — applications accepted on an ongoing basis through the CCAT grants portal while MIF funds remain | $2,500–$50,000/yr (50% match) | Rolling | Match / cost-shareReimbursed | State · CT | 6 locked |
| NJEDA Main Street Acquisition Support Grant Rolling: apply no later than one year from the date of property closing (closing must occur after 10/01/2024). | Up to $50,000 (one grant per business EIN) | Rolling | Paid direct | State · NJ | 3 locked |
| Invest Atlanta Small Business Improvement Grant (SBIG) Rolling: no application deadline posted. Apply through the Neighborly portal. | Up to $50,000 | Rolling | Match / cost-share | Local · GA | 7 locked |
| NRL Long Range Broad Agency Announcement for Basic and Applied Research White papers accepted through December 30, 2026 (N00173-24-S-BA01, Amendment 0008); formal proposals by invitation only | Varies by scope | Dec 30, 2026 41 days | Reimbursed | Federal · All US | 0 locked |
| VIPC Launch Program (Commonwealth Commercialization Fund) Launch convertible-note applications are accepted on a rolling basis and VIPC plans quarterly Launch Grant solicitations… | $50,000 | Rolling | Match / cost-share | State · VA | 6 locked |
| Boundless Futures Foundation — EmpowHer Grant Rolling — the Fall 2026 EmpowHer application is open now, with no closing date posted; the next cycle opens May 1, 2027. | Up to $50,000 (EmpowHer) | Rolling | Reimbursed | Foundation · All US | 7 locked |
| Baltimore Facade Improvement Grant (FIG) Rolling — applicants request an application and meet with BDC on site before submitting; grants must be approved before… | $10,000–$50,000 by FIG type (most 1:1 match) | Rolling | Match / cost-share | Local · MD | 6 locked |
| Vermont Working Lands Enterprise Initiative Business Enhancement Grant Business Enhancement Grant applications are open until December 10, 2026 at 2:00pm ET. | $10,000–$50,000 | Dec 10, 2026 21 days | Paid direct | State · VT | 2 locked |
| MN PROMISE Act Grant, Round 2 (Minneapolis and Saint Paul) Rolling; open until Round 2 funds are fully allocated | Up to $10,000, $25,000 or $50,000 by revenue | Rolling | Paid direct | State · MN | 6 locked |
| JobsOhio Small Business Grant Rolling. No closing date is posted; funding is capped at $8 million a year. | Up to $50,000 per project | Rolling | Reimbursed | State · OH | 6 locked |
| David Yurman GEM Awards Grant December 2, 2026 (applications close) | $50,000 (one award) | Dec 2, 2026 13 days | Paid direct | Private · All US | 6 locked |
| JVS Philadelphia Fund for Women Grants December 31, 2026 (applications accepted any time until then) | $25,000 to $50,000 | Dec 31, 2026 42 days | Paid direct | Foundation · PA | 6 locked |
82 rows is the market. Your list is much shorter. The free eligibility check runs your state, stage, industry and ownership against all 660+ US programs and ranks what you genuinely qualify for — and you get free deadline alerts on anything you star.
See your matches — free →Which $50,000+ business grants are open right now?
Eighty-two grant programs advertising $50,000 or more are accepting applications as of November 19, 2026. State economic-development agencies run 40 of the 82, federal agencies 30, cities and counties 6, and private funders or foundations 6. Forty-six accept applications on a rolling basis and 36 carry a published deadline or federal receipt date still ahead. The median advertised ceiling across the 82 is $250,000, but the advertised ceiling is the wrong number to plan around: the GrantCompass catalog’s realistic-payout note for these same programs typically lands at a fraction of the headline. Connecticut’s Manufacturing Innovation Fund Voucher Program advertises up to $100,000 and its typical award sits in the $25,000–$75,000 band. The single most useful filter at this tier is not the amount — it is whether the money is paid direct or against a match.
Dated windows inside the next 60 days
19 of the 82 programs publish a one-off closing date between November 19, 2026 (the day this was computed) and January 18, 2027, and five of them close within a week: DOE’s ARPA-E STTR topic (concept papers were due November 20) and the Department of Defense’s FY27 Release 1 SBIR topics for the Air Force, the Navy, DARPA and the wider DoD (due November 25). 11 of the 19 are federal. Separately, the National Institutes of Health’s four SBIR and STTR rows share the next standard receipt date, January 5, 2027, and the National Science Foundation’s Phase I full proposals are next due March 4, 2027, after an invited Project Pitch. All 19 are below, soonest first.
SBIR Phase I — U.S. Navy / ONR
Up to $140K + $100K option (Phase I) · closes Nov 25, 2026 · Federal
DOE Advanced Nuclear Energy Licensing Cost-Share Grant Program
Varies (cost-share structure) · closes Nov 30, 2026 · Federal
Idaho Workforce Development Council — Employer Training Grant
Up to $500,000 · closes Dec 4, 2026 · State
New Jersey Innovation Fellows Program (Cohort III)
$200,000 base, up to $400,000 · closes Dec 4, 2026 · State
USDA MPPEP Phase 3 Round 2: Invasive Wild-Caught Catfish Processing
$50,000 to $2,000,000 · closes Dec 7, 2026 · Federal
Vermont Working Lands Enterprise Initiative Business Enhancement Grant
$10,000–$50,000 · closes Dec 10, 2026 · State
Hawaiʻi Small Business Innovation Research (HSBIR) Matching Grant
Up to 50% match, up to $75,000 (Phase 0: $3K) · closes Dec 11, 2026 · State
Missouri Value-Added Agriculture Grant Program (MASBDA)
Up to $200,000 · closes Dec 15, 2026 · State
RISE PA — Small Award Track (SAT) for Small Manufacturers
Up to $500,000 (50% cost-share) · closes Dec 15, 2026 · State
SBIR Phase I — Department of Energy
Up to $250K (Phase I, by topic) · closes Dec 16, 2026 · Federal
NRL Long Range Broad Agency Announcement for Basic and Applied Research
Varies by scope · closes Dec 30, 2026 · Federal
USDA FAS Emerging Markets Program (EMP)
Varies — $8M across ~40 awards · closes Dec 31, 2026 · Federal
USDA TASC — Technical Assistance for Specialty Crops
Up to $500,000/year · closes Dec 31, 2026 · Federal
Which programs pay $50,000 to a small business, and which never do
Five kinds of program regularly put $50,000 or more into a business that applies for itself: federal SBIR and STTR Phase I research awards, state SBIR match grants, state innovation vouchers and seed grants, city small-business programs, and a short list of brand and foundation awards. Microgrants never do. They are built to spread small cheques across many winners, and GrantCompass files a grant as a microgrant when its top award is under $25,000. If none of the five fits your business, the realistic route to $50,000 is a grant plus a loan, set out in how to reach $50,000 below.
| Kind of program | Top award, as the funder sets it | Who can apply | The catch |
|---|---|---|---|
| Federal SBIR / STTR Phase Ie.g. SBIR Phase I at NSF | SBA’s current ceiling for a Phase I award without a waiver (adjusted periodically) is $335,937. No equity taken. | US small businesses with a research and development project | A full technical proposal: the most hours of any kind here |
| State SBIR / STTR matche.g. Wyoming SBIR/STTR Match | Wyoming: up to $100,000 after a Phase I award, $200,000 after Phase II | In-state companies that already hold a federal SBIR or STTR award | No federal award, no match |
| State innovation voucher or seed grante.g. Illinois Innovation Voucher | Illinois: up to $75,000. Maine Technology Institute: up to $100,000 per company in total, typically $10,000 to $30,000 for a first grant | In-state companies with a defined technology project | Usually a match, and Illinois requires a partner college |
| City small-business programe.g. Dallas SBAP | Dallas: 15% to 25% of eligible project costs, up to $400,000 | Dallas businesses with 20 or fewer employees and a capital project | 75% of the project must come from other sources |
| Brand or foundation awarde.g. Amber Grant for Women | Amber: $75,000 year-end grants on top of $15,000 monthly grants | Usually open nationally, often to one group of founders | One prize against a national field |
The full list of private funders at this size, and how a private prize differs from a government cost-share grant, is on the small business grants open now page.
Where $50,000 for your business does not come from
Microgrants and the big federal community grants are the two places founders look for $50,000 and do not find it. Microgrants top out under $25,000 and suit a first piece of equipment, not a $50,000 need. The large federal community programs are much bigger, but they are paid to governments. HUD’s Community Development Block Grant says so in plain words:
“HUD does not provide CDBG assistance directly to individuals, businesses”HUD, Community Development Block Grant Program
The same HUD page lists assistance to profit-motivated businesses for economic development as an eligible use, so a business reaches CDBG money through the city or county program that re-grants it, usually a storefront, facade or small-business improvement fund. EDA Public Works works the same way: applicants must be a state or local government, a tribe, a college or a nonprofit, and for-profit businesses cannot apply directly. A $50,000 search that starts with the city’s economic development office often ends in a better place than one that starts on a federal portal.
What a $50,000 grant demands that a $10,000 grant does not
Moving from the under-$25,000 tier to the $50,000-and-up tier multiplies the application by roughly six and leaves the odds almost unchanged. In our August 24, 2026 extract, the median estimated application among open grant programs at $50,000 or more took 24.5 hours; the median under $25,000 took 4 hours. Recomputed on November 19, 2026, the $50,000-and-up median is 25 hours across 82 open programs, so the gap holds. Mean competitiveness moves from 2.90 to 3.28 on a 1–5 scale — a 13% increase for a six-fold increase in work. Median accessibility, our 1–10 measure of how approachable the paperwork is, falls from 8 to 6. The premium at this tier is paid in hours and in documentation, not in a materially worse chance of winning.
Open grants under $25,000
- Programs
- 29
- Median hours
- 4
- Mean competitiveness
- 2.90 / 5
- Median accessibility
- 8 / 10
Open grants $25,000–$49,999
- Programs
- 11
- Median hours
- 12
- Mean competitiveness
- 2.45 / 5
- Median accessibility
- 7 / 10
Open grants $50,000 and up (August 24)
- Programs
- 68
- Median hours
- 24.5
- Mean competitiveness
- 3.28 / 5
- Median accessibility
- 6 / 10
The extra hours buy three specific documents. Reading the intake descriptions across this tier, the work that separates a $50,000-plus application from a microgrant application is a project budget that ties every line to an eligible cost category, a narrative that quantifies an outcome the agency can report upward — jobs created, energy saved, a technology de-risked — and third-party attestation, which at this tier means an accountant, an engineer, a partnering college or a federal award letter you already hold. The Illinois Innovation Voucher Program, at up to $75,000, will not read a proposal that does not name the Illinois research institution doing the work. The Indiana FAST Program processes nothing until a federal Phase II award exists.
Time is also the reason the $50,000 tier is not automatically the better bet. Whether a longer application is worth it depends on the ratio of award to hours, which is the question our companion analysis of the fastest business grant applications takes apart directly. This page answers the narrower one: what changes about the work itself when the number gets larger.
How many hours a $50,000 application takes, by kind of program
The kind of program decides the hours far more than the dollar figure does. Across the GrantCompass catalog, the median estimated application for a federal SBIR or STTR Phase I proposal is 115 hours. A state SBIR match grant takes a median of 10 hours, a city small-business program 11, and a state innovation voucher or seed grant 20. A microgrant takes 5 (whole catalog, any status; the 4-hour figure above counts open grants only). The section above compares hours by award size; this one compares them by program kind, which is the choice a founder actually makes.
Median estimated application hours, by kind of program
Three rules follow from the chart.
- If you hold a federal SBIR or STTR award, file the state match first. At a median of 10 hours it is the cheapest $50,000-plus application there is, about a tenth of the federal proposal that earned it.
- If you do not, a state voucher or a city program is the cheapest first $50,000 you are not competing nationally for. Both run 11 to 20 hours, but both usually ask you to bring money of your own, which the match math below sizes.
- Write an SBIR Phase I proposal only for research you would do anyway. 115 hours is about three working weeks. The award can be several times $50,000, but the proposal is a research plan judged on its technical merit, not a business pitch.
Cost-share and matching at the $50,000+ tier
Thirty-seven of the 82 open $50,000-plus programs — 45% — carry a matching, cost-share or reimbursement requirement. Twenty-five require a match or cost-share, meaning the business must commit its own money alongside the award. Twenty-five are structured as reimbursements, meaning the business pays first and is repaid after the spend is documented. Thirteen do both. At the microgrant tier this structure is rare; at $50,000 and above it is the norm, and it is the single largest reason a business that "wins" a grant at this tier still cannot use it.
A match is a cash-flow event, not a discount. On a 50% cost-share, a $60,000 award describes a $120,000 project: the agency pays half after you commit the other half, so the number in the headline is twice the number in your budget. New Hampshire's WorkInvestNH publishes its range as $750 to $100,000 at a 50% match; Connecticut's Manufacturing Innovation Fund Incumbent Worker Training programme publishes $2,500 to $50,000 a year, also at 50%; the Illinois Innovation Voucher Program, confirmed at the Illinois Department of Commerce and Economic Opportunity on August 23, 2026, covers up to 75% of the cost of research work done with an Illinois research institution. In every one of those cases the advertised ceiling describes the size of a project, not the size of a cheque.
Reimbursement is a different problem with the same symptom. Colorado's Existing Industry Customized Training Program, Boston's ReStore storefront grant and Chicago's Small Business Improvement Fund all pay against documented, already-incurred cost, and Chicago's cost-share ratio itself varies between 30% and 90% depending on the tax-increment district's budget. A business with $8,000 of monthly headroom cannot run a $120,000 reimbursed project regardless of how well it writes. The honest sequence at this tier is to establish how the money lands before writing a word, then size the project to the cash you can actually float. Our guide to how to apply for a small business grant covers the paperwork order; this page covers only what the $50,000-plus tier specifically adds.
How to reach $50,000: match math and grant-plus-loan stacks
The usual route to $50,000 is two or three sources rather than one grant. Run the rule on the City of Dallas Small Business Assistance Program’s published shares: with five living-wage jobs created, the city pays 25% of eligible project costs, so $50,000 of city grant needs a $200,000 project, and $150,000 of it comes from banks or cash on hand (Dallas requires at least 75% from non-City sources). A $200,000 project meets Dallas’s $150,000 minimum investment only in a Target Area; elsewhere the minimum is $250,000.
What a $50,000 grant asks you to bring
The rule is one division: the project a grant needs equals the grant divided by the share the grant pays. A grant that pays half of a project needs a project twice its size, so $50,000 of grant money at a 1:1 match means a $100,000 project and $50,000 of your own. The table runs the common shares.
| Grant pays | Project needed | You bring | Where this share shows up |
|---|---|---|---|
| 100% (no match) | $50,000 | $0 | NIH SBIR and STTR Phase I; most brand awards |
| 75% | $66,667 | $16,667 | Some state innovation vouchers |
| 50% (1:1 match) | $100,000 | $50,000 | Many state training and voucher funds |
| 25% | $200,000 | $150,000 | Dallas SBAP with job creation |
| 15% | $333,333 | $283,333 | Dallas SBAP base award |
One more line belongs in the plan. If a grant pays after you spend, you also carry the grant’s share until it arrives, so the cash you need at the start is the whole project, not just your share.
For $50,000 of grant money at 50%, the project is $100,000 and you bring $50,000. Cash needed at the start: $50,000.
Loans that sit under a grant
Your share of a matched grant can be borrowed, and three loan programs are built for this size. Check first that the grant accepts borrowed money as your match; its guidelines say whether it does.
| Lender | Size | Terms the lender states | Fits |
|---|---|---|---|
| SBA Microloan | Up to $50,000; the average is about $13,000 | Made through SBA intermediaries; cannot pay existing debts or buy real estate | Your half of a 1:1 match up to $50,000 |
| Kiva US | $1,000 to $15,000 | 0% interest, no fees, no collateral | Your share on a 75% grant of up to $45,000 |
| SBA 7(a) loan | Up to $5 million | Made by lenders with an SBA loan guarantee | The 75% of a city capital project |
Worked example: $50,000 of equipment, not $50,000 of grant
A founder who needs $50,000 of spending, not $50,000 of grant, needs far less grant money than the headline suggests. Take a $50,000 equipment project and a state grant that pays 50%. The grant covers $25,000. An SBA Microloan, which goes up to $50,000, covers the other $25,000. The founder has $50,000 of equipment from a $25,000 award, and needs no $50,000 program at all. If the grant pays after the spend, the founder has to carry the full $50,000 first, which is where a bank line or the microloan sized to the whole project comes in.
Seven of the largest numbers on this page are not yours to apply for
At the $50,000-plus tier a recurring pattern appears that does not exist in microgrants: the programme is real, the money is real, and the applicant of record is somebody else. A city applies. A community college applies. An economic-development officer negotiates a package during a site-selection process that a small business is never invited into. At least seven of the 82 programs here work that way, and they include several of the biggest advertised numbers on the page.
Wyoming's Business Ready Community Grant advertises up to $5,000,000 and is applied for by a municipality. The Wyoming Business Council's own programme page states that cities, towns, counties and joint-powers boards are the primary applicants; a business benefits as the committed tenant or employer, not as the grantee. The Texas Skills Development Fund advertises up to $500,000 and is applied for by a public community or technical college, the Texas A&M Engineering Extension Service or the Texas Engineering Experiment Station, which then delivers the training; the Texas Workforce Commission accepts proposals year-round, but not from you directly. Tennessee's FastTrack Economic Development Fund is negotiated through a local government during active site selection and has no public application portal at all.
The pattern continues down the list. The One North Carolina Fund and the Minnesota Job Creation Fund are deal-by-deal instruments evaluated by state business-development staff while a project is choosing between states; the Oregon Business Expansion Program is negotiated with Business Oregon regional project managers on a formula tied to the income tax generated by new jobs; the EDA Economic Adjustment Assistance Revolving Loan Fund awards $800,000 to $1,400,000 to the organisation that will operate a loan fund, not to the businesses that later borrow from it. Naming this pattern is not a criticism of the programmes — they are doing what they were designed to do. It is a criticism of every list that prints "up to $5 million" next to a small business's name.
What this means in practice. If your business is genuinely the applicant, the reachable end of this page is the state innovation, voucher, commercialization and training programmes in the $50,000 to $250,000 band, plus the federal research vehicles if you are retiring a technical risk. If a project of yours is large enough to move a county's employment numbers, the productive first call is not a grant portal — it is the regional economic-development officer, because the instrument that fits you is one they file.
Where $50,000+ grant money actually sits: state, not federal
State agencies run 40 of the 82 open programs at this tier, more than the 30 federal ones. That inverts where most founders look first, and it holds even though federal programmes carry far larger ceilings.
The state layer is also where the caveats concentrate differently from the federal layer. Federal caveats here are cyclical — the National Institutes of Health works to three receipt dates a year, and the National Science Foundation accepts full proposals only after an invited Project Pitch — and they resolve on a published calendar. State caveats are budgetary: a rolling programme stays "open" in every listing until the appropriation is spent, and nothing announces the moment it runs out. That asymmetry is why this page prints the funder's own words in every row rather than a green dot. For the full state-by-state picture at every award size, see state small business grants open now; for the federal layer including what is not a grant at all, see federal small business grants open now.
The numbers behind the $50,000+ tier
82 open programs, a $250,000 median advertised ceiling, a 25-hour median application, and a 3.28 mean competitiveness score. Every figure in this section is computed from the November 19, 2026 snapshot except the tier comparison, which is from August 24, 2026; the method is stated at the bottom of this section.
The 82 open $50,000+ grants, by level of government
- Federal 30
- State 40
- City / county 6
- Private / foundation 6
How the 82 intakes actually work
- The hours are the tier tax. Median application effort rose from 4 hours under $25,000 to 12 hours at $25,000–$49,999 to 24.5 hours at $50,000 and above in the August 24, 2026 extract; the $50,000-plus median is 25 hours on November 19.
- Competition does not rise proportionally. Mean competitiveness went 2.90 → 2.45 → 3.28 across those three tiers in August, and the $50,000-plus mean is 3.28 on November 19, across the 71 programs scored on that scale. The middle tier was the least contested band in the dataset.
- Nearly half the tier is not cash on arrival. 37 of 82 carry a match, cost-share or reimbursement condition on November 19 (30 of 68 in August, after five false positives were removed by hand).
- More than half are rolling. 46 of 82 accept applications any day, so deadline pressure is a poor reason to skip this tier — and a poor reason to trust a listing, since a rolling programme stops when its appropriation does and nothing announces it.
- Checking the funder moved six rows in August. Nine of the 68 rows on August 24, 2026 arrived with a status note that needed verifying; six of those nine were stale in our own catalog and were corrected, including two that were quietly open. The October 1 recompute then moved 22 more: 14 out and 8 in; the November 19 recompute moved 38: 8 out and 30 in.
Which three of the 82 are actually worth your time
I read all 68 rows when I built this page in August, and all three picks below are still open as of November 19, 2026. Most of them are excellent programmes for a business that is not yours — wrong state, wrong industry, wrong applicant. Three stand out as genuinely reachable at this tier by an ordinary operating company, and each is picked on the published numbers, not on brand. Each also has a gate, stated plainly.
1. Connecticut Manufacturing Innovation Fund Voucher Program (MVP)
Eight estimated hours against a $100,000 ceiling is the best work-to-ceiling ratio in the tier, and the intake is rolling and first-come rather than a once-a-year scramble. The Connecticut Department of Economic and Community Development runs it with the Connecticut Center for Advanced Technology; the $100,000 ceiling and the first-come structure were confirmed at CCAT on August 24, 2026, and typical awards land in the $25,000–$75,000 band rather than at the cap. The gate, stated honestly: this is a matching voucher, and the ratio matters enormously to whether it is worth eight hours — but the ratio and the Connecticut-tenure requirement are published only inside a portal that no machine-readable official page mirrors, and secondary sources disagree with each other. Call CCAT and ask two questions before you start: what is my match ratio as a first-time applicant, and how long must I have been registered in Connecticut. Worth your time if you are a Connecticut manufacturer with a defined equipment or process project and the cash to fund the larger share of it.
2. Wyoming SBIR/STTR Match Grant
Ten hours, applications open year-round, and a decision within roughly two weeks of a virtual pitch — the fastest decision cycle at this size anywhere on this page. State SBIR match programmes are structurally the most winnable large grants in the United States because the hard selection already happened at the federal agency; the state is topping up a company it did not have to evaluate. The gate: you must already hold a federal SBIR or STTR award, and you must be a Wyoming company. If you hold a Phase I award and you are in one of the nineteen match states, apply in your own state before you look at anything else on this page.
3. Texas Skills Development Fund
The largest number in the tier that an ordinary Texas employer can genuinely reach, and at competitiveness 2 of 5 it is among the least contested. The Texas Workforce Commission accepts proposals throughout the year. The gate is the biggest on this list and it is worth understanding rather than avoiding: the applicant is a public community or technical college, the Texas A&M Engineering Extension Service or the Texas Engineering Experiment Station, partnering with you; the money is paid to that institution, which delivers the training; you never see cash. If what you actually need is your workforce upskilled, that is a feature. If what you need is capital, this is the wrong programme and the state innovation and commercialization funds above are the right ones.
Honourable mention, with a warning. The NYSERDA FlexTech Program shows up in this tier at "up to $1,000,000" with a competitiveness of 1 of 5 and a 5-hour application, which reads like the best deal on the page. It is not, for a small business: our catalog's realistic-payout note puts typical small-business FlexTech cost-share at $2,000–$25,000, because the award scales to the cost of an energy study and a small building's study is small. One caveat we will not paper over — NYSERDA's own FlexTech page is script-rendered and could not be machine-read on August 24, 2026, so the cost-share percentage and the $1,000,000 ceiling shown in the table are our stored values rather than values re-read at source. Call NYSERDA before you plan around either number. Programmes like it are why this page prints an advertised ceiling and a competition score side by side instead of ranking on the headline number.
What changed in this slice
A maintained page should show its repairs. These are the dated corrections and status changes that touched $50,000-plus programs in the GrantCompass catalog, newest first. Each monthly recomputation appends to this list rather than replacing it.
- Recomputed against the catalog with the site-wide open-now rule. Left the open list: DOE’s EERE funding notices and DoD STTR Phase I, now between releases; the Arizona Job Training Program, which has ended; the DOE ITAC Implementation Grant, with submissions on hold; the Chicago Neighborhood Opportunity Fund, whose November 13 quarterly deadline has passed; the Illinois Innovation Voucher Program, whose Round 3 funds are spent; the Arizona Advanced Manufacturing Facilities Grant, now recorded as closed, which retires the last Check status tag; and Philadelphia’s Commerce Department grants, which publish no intake window. Joined: the Department of Defense’s FY27 Release 1 SBIR topics (Air Force, Navy, DoD-wide; due November 25), Army SBIR topics, DOE’s Fall 2026 SBIR Phase I and ARPA-E STTR topics, DOE’s advanced nuclear licensing cost-share (rolling to November 30), USDA’s Emerging Markets, TASC and catfish-processing programs, the EPA Brownfields cleanup grants, the Naval Research Laboratory BAA, RISE PA, Missouri’s value-added agriculture grant, Hawaii’s SBIR match, New Jersey Innovation Fellows, Maryland’s MSCRF commercialization award, Vermont’s Working Lands enhancement grant, VIPC Launch, One North Carolina’s SBIR program, Minnesota’s PROMISE Act grant, JobsOhio’s small business grant, the Texas Enterprise Fund, MassCEC’s heat-pump training network, Atlanta, Baltimore and Boston storefront grants, the Thiel Fellowship, the David Yurman Gem Awards, Boundless Futures’ EmpowHer grant and the JVS Philadelphia Fund for Women grants.
- The September DARPA SBIR and DoD STTR topics closed October 21, 2026. One DARPA topic (TRIAGE-X) stayed open until November 25, and the next DoD release was scheduled to run from October 28 to November 25, 2026.
- Recomputed against the catalog with the site-wide open-now rule. Left the open list: the DOE Advanced Nuclear Licensing Cost-Share and the NOAA Fisheries BAA, both closed September 30, 2026; DOE STTR Phase I, Delaware EDGE, NC IDEA SEED and the Colorado Advanced Industries Accelerator, now between intakes; six periodic programmes with no live date — the Maryland Innovation Initiative, Maryland MIPS, Missouri Technology Corporation, VIPC Launch, Detroit Motor City Match and Utah REDI — together with the Alabama Innovation Grant; and IFundWomen, whose stored ceiling is now $25,000. Joined: DARPA SBIR and DoD STTR Phase I topics (their September topics closed October 21, 2026), Air Force SBIR Phase I open topics, NOAA’s Bycatch Reduction Engineering Program (full proposals due January 22, 2027), the Fish and Wildlife Service’s Partners for Fish and Wildlife and Coastal programs, NJEDA’s Main Street Acquisition Support Grant and West Sacramento’s Small Business Assistance Program. The four NIH SBIR and STTR rows moved to the January 5, 2027 receipt date, and the two NSF Phase I rows dropped their Check status tag once NSF published its November 4, 2026 full-proposal date, which has since passed.
- Our record for the Colorado Advanced Industries Accelerator read “FY2025 cycle closed; FY2026 dates TBA”. The Colorado Office of Economic Development and International Trade's own pages showed the Advanced Industries Early-Stage Capital and Retention grant and the Proof of Concept grant were both taking applications, with a hard close that fell on August 27, 2026 at 5pm MT. The row moved from Check status to a dated window for nine days. That window has since closed and the row is back to Check status until a new round is posted.
- The DOE ITAC Implementation Grant was stored as “on hold pending program restart (as of late 2025)”. The Department of Energy's Office of Manufacturing and Energy Supply Chains lists it as active, at up to $300,000 per qualified assessment recommendation, applied for through the EnergyWerx portal. Reclassified as rolling and open.
- The Arizona Advanced Manufacturing Facilities Grant, stored at up to $75,000 with a 1:1 match, does not appear under that name anywhere on the Arizona Commerce Authority's current programme index. The row keeps its stored values, gains a Check status tag, and is logged for the catalog. The Authority's current manufacturing incentives are tax credits, not cash grants.
- Delaware EDGE's September 11, 2026 deadline was confirmed, but the award is not a per-company figure: the Delaware Division of Small Business publishes pooled totals of $750,000 for the STEM track and $400,000 for the Entrepreneur track, split across up to 18 winners with amounts scaled to the pitch. The card above says so; the stored “up to ~$175,000” is logged as a follow-up.
- The four National Institutes of Health SBIR and STTR rows stored the label “between intakes” alongside a live September 8, 2026 standard receipt date. September 5 is a real Cycle I omnibus receipt date on the NIH due-date schedule, with January 5 and April 5 behind it. They count as open here and sit in the recurring-receipt group rather than among one-off closings.
- The VIPC Launch Program ($50,000, Commonwealth Commercialization Fund) was stored as rolling and first-come. The Virginia Innovation Partnership Corporation runs quarterly solicitations, roughly 20 selections a year. Corrected at the source; this page prints the quarterly cadence.
- The CDC/NIOSH Commercial Fishing Occupational Safety Research cooperative agreement was stored with an August 25, 2026 receipt date. At the time, the notice's schedule gave August 28, 2026. That date has since passed; the next standard receipt date is January 26, 2027, and the row above uses that date.
- The Minnesota Job Creation Fund is stored at “typically $500K–$3M”. Minnesota DEED's published ceiling is up to $1,000,000, paid as a performance rebate after at least $500,000 of investment and 10 new full-time jobs. Logged as a follow-up; the row prints the stored range, and this note is why $3,000,000 is not a plan.
- Wyoming Business Ready Community, the Texas Skills Development Fund and Tennessee FastTrack were each confirmed at their own agency's page to be instruments a business does not file itself. All three keep their rows and their advertised amounts; the “Seven of the largest numbers” section on this page exists because of that check.
- RISE PA round 4 closed on August 17, 2026 and left every open count on this site the same week. It is a sub-$50,000 award track and never belonged to this slice, but it is the clearest recent proof that an active status field is not evidence: the page still listing it as open was right seven days earlier.
Every row above carries locked intel
Knowing a $50,000 programme exists is the easy half. Every row in the table also carries a Win Layer — our analysis of who actually wins it and why applications fail. Across these 82 programs, 75 carry at least five of the seven Win Layer fields and 20 carry all seven.
- Approval odds
- What winners look like
- How it is judged
- Rejection traps
- Required documents
- When cash actually lands
- Clawback risk
At this tier the "when cash actually lands" field is the one that changes decisions, because 25 of these 82 programmes pay only after you have already spent. Pro unlocks all seven fields on all 660+ programs, plus deadline alerts. $49/mo · $249/yr.
See what Pro unlocks →Work the whole database, sorted by size
This page is one slice of one date. The database holds all 660+ US programs with what is true about each: type, level, status, advertised ceiling, realistic payout and estimated effort. The link below opens it filtered to open programmes and sorted by advertised maximum, largest first — so loans and tax credits appear alongside grants and you can see the whole capital picture at this size. Star what fits, and we watch the deadlines for you. Free.
- 1. Open, sorted biggest-first
- 2. Star what fits
- 3. We watch the deadlines
Questions people ask about grants of this size
“What is the largest small business grant I can actually get?”
The largest advertised numbers in this slice belong to federal research vehicles and state deal-making instruments, and neither is what most people mean by the question. Of the 82 open programmes at $50,000 or more, the ones an ordinary operating business files itself and can realistically win top out in the low hundreds of thousands: Chicago’s Small Business Improvement Fund at up to $250,000, Boston’s ReStore storefront grant at up to $200,000 and the City of Dallas Small Business Assistance Program at up to $400,000. Above that, the numbers describe projects with municipal or institutional partners. For the ranked view of the biggest programmes across the whole catalog rather than only the open ones, see the biggest small business grants.
“Are there $50,000 grants with no deadline?”
Yes, and they are the majority. Forty-six of the 82 open programmes at this tier accept applications on a rolling basis, including the Connecticut Manufacturing Innovation Fund Voucher Program, the Wyoming SBIR/STTR Match Grant, Chicago’s Small Business Improvement Fund and the Maine Technology Institute Business Innovation Seed Grant, typically $10,000 to $30,000 for a first grant and up to $100,000 per company. Rolling does not mean permanent: most of these are funded from an annual appropriation and stop when it is spent, which is a different and quieter kind of deadline. The full year-round list across all award sizes is at no-deadline small business grants.
“Is a $50,000 grant harder to get than a $5,000 one?”
It is harder to apply for and only slightly harder to win. Our August 24, 2026 extract put mean competitiveness at 3.28 of 5 for open grants of $50,000 and above (3.23 on October 1) against 2.90 of 5 for open grants under $25,000 — a real difference, but a small one next to the six-fold difference in application hours. The reason is that the two tiers draw different pools. A $5,000 microgrant is open to every business in the country and attracts thousands of two-hour applications; a $75,000 state innovation voucher is open only to companies in one state, in named industries, with a defined project and often a matching contribution, and most of the country self-selects out before writing anything. Narrow eligibility is what keeps large-grant competition lower than intuition predicts.
“How long does a $50,000+ grant take to pay out?”
Longer than the application, and at this tier the payment structure is the part to check first. Twenty-five of the 82 open programmes are reimbursements, which means the business spends first and is repaid on documentation. Match programmes require the company's contribution to be committed before or alongside the award. Federal research awards run on a drawdown schedule against an approved budget. State job-creation and payroll-rebate instruments — Oklahoma's Quality Jobs programmes, Arkansas's CREATE Rebate — pay quarterly over as long as ten years, after the jobs exist. This page does not publish per-programme payment timing; the point here is that "up to $500,000" and "$500,000 in your account" are separated by a structure worth reading before you write.
“What counts as open on this page?”
Open means the programme’s status is active in the GrantCompass catalog and it either has a published deadline on or after today or takes applications on a rolling basis — the same rule every open-now page on this site uses. It does not mean money remains, and it does not override what the funder says. The October 1, 2026 recompute removed six periodic programmes whose next window has no published date: a quarterly or round-based programme with no live date is not open today, whatever its status field says. The last row that carried a Check status tag, the Arizona Advanced Manufacturing Facilities Grant, left the list on November 19, 2026, when our catalog recorded it as closed. A list that hides that kind of doubt to keep a count round is telling you about doors, not about money.